What's Proposed?
A
Proposition A
Student Activity Center Renovations
-
Additional cafeteria serving line
-
Renovations to address current facility conditions (new ceiling tiles, new flooring, foundation repairs)
Renovations to Ag Barn and Ag Shop
-
Additional animal pens
-
New water line to improve water pressure for washing animals
-
Upgrades to the facility’s electrical infrastructure
-
New cameras to monitor the facility, ensuring the safety of students and their animals.
Elementary School Renovations
-
Renovations designed to address current facility conditions and provide updated learning environments for students
-
Replace the playground equipment with new structures that meet today’s safety standards
-
New water fountains on the playground and throughout the elementary building
Security/DPS Building Renovations
-
New roof
-
Fire alarm system
-
Signage
B
Proposition B
Football, Baseball, and Softball Safety Improvements and Renovations
-
New turf for all three fields, creating consistent playing surfaces that reduce safety risks
-
New lighting systems to improve visibility during practices and games
-
Updated scoreboards for school and community events
C
Proposition C
New Covered Field
-
To be potentially used for recess, physical education, band, and athletics
